Project |01
Roof Truss Design for a Gymnasium​
-
Analyzed and designed 300ft long Pratt Truss for a Gymnasium with 40ft spacing between trusses using SAP2000
-
Designed truss members and connections following AISC specifications
-
Drafted different connection details in AutoCAD
Project |02
Bridge Design - Advanced Structural Design Studio
-
Analyzed and designed 900ft long 5 span continuous Prestressed Concrete bridge for TxDOT and AASHTO specifications
-
Considered unshored construction method for super structure design
-
Designed Piers of the bridge for seismic loads
Project |03
Prestressed Concrete Box - Girder Bridge With Internal Post - Tension System
​
-
Designed the prestressing system for a box girder bridge
-
Used concentric pretensioning and two stages of post tensioning
-
Performed Ultimate stress checks